Set out line of walls
Position and level shims to achieve a gap of 30 mm between the floor and the underside of the wall panel
Position wall elements to line and prop in position. Push pull props (two per panel) are bolted to the face of the panel ( cast in anchors) and to the top of the floor slab.
Fix reinforcement cage to joint between adjacent panels
Seal vertical joints between panels
Seal horizontal joint at base of panel
Fix starter bars / tie bars to panel over
Fill panel with 35N10 structural concrete.
Timber form at kicker level
Starter bars from the wall below projecting into the void area between the two plates.
Panel lowered into position over the starter bars projecting from the walls below .
Propped panel
Propped Gable wall panels (max height 6.1m) manufactured to the exact profile of the roof.